Detcon PI-600 Manual do Utilizador Página 26

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 37
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 25
2
) If skilled technicians are available, replace just the UV lamp every 9-12 months.
3) For abnormally high rates of signal decay, clean the UV lamp monthly, using a Lamp Cleaning Kit, and replace the
UV lamp every 9-12 months.
4) For any proven cases where the zero baseline has drifted up, replace the detector cell.
3.8.5.2 PID Plug-In Sensor Maintenance Procedure
All piD Sensor Cells contain six user replacable parts.
Disassembly
1) Power down the instrument and remove the sensor cell.
2) Remove the filtercap by applying a slight upward pressure with the tip of a screwdriver or an Exacto Blade just
below the hole in the cap and between the cap and the housing.
3) With a fine tipped tweezers, remove both of the Filter Media and set aside.
PI-600 Toxic Gas Sensors PG.26
Vista de página 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 36 37

Comentários a estes Manuais

Sem comentários